
Installation – Terminal Description
29
4.1.7.1 CONNECTION TO TERMINALS 45 & 46/47
The function of terminals 45 & 46/47 change position depending upon wiring topology as follows:
Topology Pin No. Description Cable Size
No earth fault measuring
45 DO NOT CONNECT
46/47
Connect to s2 of the CTs connected to
L1,L2,L3,N
2.5mm²
AWG 13
Restricted earth fault measuring
45
Connect to s2 of the CTs connected to
L1,L2,L3,N
2.5mm²
AWG 13
46/47
Connect to s1 of the CT on the neutral
conductor
2.5mm²
AWG 13
Un-restricted earth fault measuring
(Earth fault CT is fitted in the neutral
to earth link)
45
Connect to s1 of the CT on the neutral
to earth conductor.
2.5mm²
AWG 13
46/47
Connect to s2 of the CT on the neutral
to earth link.
Also connect to the s2 of CTs connected
to L1, L2, L3.
2.5mm²
AWG 13
4.1.7.2 CT CONNECTIONS
p1,
k
or K is the primary of the CT that ‘points’ towards the SUPPLY
p2,
l
or L is the primary of the CT that ‘points’ towards the LOAD
s1 is the secondary of the CT that connects to the DSE Module’s input for the CT measuring
(I1,I2,I3)
s2 is the secondary of the CT that should be commoned with the s2 connections of all the other CTs
and connected to the CT common terminal of the module.
CT labelled as
p1,
k
or K
CT labelled as
p2,
l
or L
To Supply
To Load
Kommentare zu diesen Handbüchern