Brainboxes PX-823 Spezifikationen Seite 51

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 122
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 50
DSE7200 / 7300 Series Operators Manual
51
4.4.4 2 PHASE (L1 & L2) 3 WIRE WITH RESTRICTED EARTH FAULT
NOTE:- Earth fault protection alarm only available on 7300 series V2.0 and above controllers. 7300
series V1.x.x modules have Earth fault measuring only (no protection alarms).
NOTE:- Mains sensing (Terminals 47-50) is not fitted to DSE7210/ DSE7310 autostart controllers.
NOTE:- Earthing the neutral conductor ‘before’ the neutral CT allows the module to read earth faults
‘after’ the CT only (Restricted to load / downstream of the CT)
Earthing the neutral conductor ‘after’ the neutral CT allows the module to read earth faults ‘before’ the CT
only (Restricted to generator / upstream of the CT)
Seitenansicht 50
1 2 ... 46 47 48 49 50 51 52 53 54 55 56 ... 121 122

Kommentare zu diesen Handbüchern

Keine Kommentare